DocumentCode :
2088363
Title :
A new method for unit ramp rate processing in Lagrangian relaxation unit commitment
Author :
Peterson, William L. ; Brammer, Steven R. ; Elder, Scott O.
Author_Institution :
Stagg Syst. Inc., Houston, TX, USA
fYear :
1994
fDate :
10-13 Apr 1994
Firstpage :
222
Lastpage :
224
Abstract :
This paper presents a Lagrangian relaxation based technique for solving the power system thermal unit commitment problem. The specific technique described in this paper focuses on finding a feasible commitment, then attempting to improve on the optimality of the solution. A new method for processing ramp rate constraints is also introduced. The algorithm has been implemented on a large scale power system
Keywords :
load dispatching; load distribution; optimisation; power systems; thermal power stations; Lagrangian relaxation; algorithm; optimisation; power system; thermal power plants; unit commitment; unit ramp rate processing; Cost function; Dispatching; Fuel economy; Lagrangian functions; Large-scale systems; Power generation; Power generation economics; Power systems;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Southeastcon '94. Creative Technology Transfer - A Global Affair., Proceedings of the 1994 IEEE
Conference_Location :
Miami, FL
Print_ISBN :
0-7803-1797-1
Type :
conf
DOI :
10.1109/SECON.1994.324302
Filename :
324302
Link To Document :
بازگشت