DocumentCode
2088482
Title
The Establishment and Calculating Model Method of Unforeseen Expenses for Civil Aircraft Research Project
Author
Yu, Ying ; Liu, Wei
Author_Institution
Econ. & Manage. Dept., Beihang Univ., Beijing, China
fYear
2009
fDate
20-22 Sept. 2009
Firstpage
1
Lastpage
4
Abstract
In civil aircraft research project, it usually takes a certain percentage unforeseen expenses additionally in the budget process to cope with unexpected events brought by overspending, and ensure the funds required. In this paper, the objectivity of the unforeseen expenses establishment is first discussed, followed by expounding the decisive factors of establishing unforeseen expenses. At last we analyze the limitations of commonly used estimation methods and propose the calculating model method. We develop the existing methods which are too subject or too complicated, and this method is more compatible with civil aircraft research project.
Keywords
aircraft; budget process; calculating model; civil aircraft research project; estimation method; unforeseen expenses; Aerospace electronics; Aerospace engineering; Aircraft manufacture; Aircraft propulsion; Financial management; Manufacturing processes; Power generation economics; Project management; Technological innovation; Uncertainty;
fLanguage
English
Publisher
ieee
Conference_Titel
Management and Service Science, 2009. MASS '09. International Conference on
Conference_Location
Wuhan
Print_ISBN
978-1-4244-4638-4
Electronic_ISBN
978-1-4244-4639-1
Type
conf
DOI
10.1109/ICMSS.2009.5301604
Filename
5301604
Link To Document