Title :
Using simulation model to integrate production plan and dispatching system
Author :
Chang, Ju Hua ; Tsai, Ming Hui
Author_Institution :
Powerchip Semicond. Corp., Hsinchu
Abstract :
This paper describes a SPDIS (Simulation, Production Plan and Dispatching Integration System) for linking between PMC (production management control department) and MFG (manufacturing department). First of all is the outline of this system. Then the forecast output difference between tool limitation and no tool limitation and then the shop floor control logic. In the end, it has been proved that the SPDlS not only improves the delivery rate but also reduces the argument between PMC and MFG. Implementation of the SPDIS improves CLIP by 60%. It means we have improved the delivery time and increase customer´s satisfaction
Keywords :
customer satisfaction; dispatching; integrated circuit manufacture; production planning; customer satisfaction; delivery rate; dispatching system; manufacturing department; production management control department; production plan; shop floor control logic; simulation model; Costs; Demand forecasting; Dispatching; Fabrication; Feedback; Flow production systems; Power system modeling; Production planning; Production systems; Supply chains;
Conference_Titel :
Semiconductor Manufacturing, 2005. ISSM 2005, IEEE International Symposium on
Conference_Location :
San Jose, CA
Print_ISBN :
0-7803-9143-8
DOI :
10.1109/ISSM.2005.1513305