DocumentCode
2089531
Title
A best known methodology for transfer machine metrics from technology development facility to high volume manufacturing facility
Author
Segal, Tomer ; Powell, John ; Assaf, Orit
Author_Institution
Intel Corp., Lachish
fYear
2005
fDate
13-15 Sept. 2005
Firstpage
109
Lastpage
112
Abstract
In advanced semi-conductor manufacturing capital equipment depreciation drives the largest cost in producing products. Therefore, it is critical to have the exact amount of machines (or tools). Several parameters dictate machine quantities for a given technology launch to high volume manufacturing, such as: availability, utilization, run rate, synergies with other technologies and time factors. These machine parameters, also known as "machine metrics", must be optimized. This paper presents a best known methodology to transfer the machine metrics from technology development (TD) site to high volume manufacturing (HVM) site in order to minimize the changes in tools\´ quantities forecast
Keywords
capacity planning (manufacturing); integrated circuit manufacture; production equipment; production facilities; advanced semiconductor manufacturing; capital equipment depreciation; high volume manufacturing facility; machine availability; machine run rate; machine technological synergy; machine time factors; machine utilization; technology development facility; transfer machine metrics; Availability; Costs; Manufacturing; Mathematical model; Performance evaluation; Predictive models; Production; Semiconductor device modeling; Testing; Time factors;
fLanguage
English
Publisher
ieee
Conference_Titel
Semiconductor Manufacturing, 2005. ISSM 2005, IEEE International Symposium on
Conference_Location
San Jose, CA
Print_ISBN
0-7803-9143-8
Type
conf
DOI
10.1109/ISSM.2005.1513309
Filename
1513309
Link To Document