• DocumentCode
    2091114
  • Title

    Semiconductor production schedule check and correction technique through mobile agent system

  • Author

    Fujinaga, Kiyohisa ; Takazawa, Gaku ; Sato, Goh

  • Author_Institution
    Hokkaido Inst. of Technol., Sapporo
  • fYear
    2005
  • fDate
    13-15 Sept. 2005
  • Firstpage
    335
  • Lastpage
    338
  • Abstract
    A novel agent system that can check and correct machine schedules in semiconductor production was proposed The system consists of stationary machine agents that control their machine schedules, mobile agents that move between the machines, machine schedule files described in XML, and a time buffer stage where lots wait to keep the machine schedules. The real-time scheduling system proceeds according to the rules of mobile agent generation, machine scheduling, and machine and mobile agents collaboration. The system was confirmed through the computer simulation, supposing a small-scaled semiconductor production line
  • Keywords
    XML; control engineering computing; integrated circuit manufacture; mobile agents; multi-agent systems; production control; production engineering computing; scheduling; XML; computer simulation; machine collaboration; machine schedules; mobile agent system; mobile agents; mobile agents collaboration; real-time scheduling system; schedule check technique; schedule correction technique; semiconductor production schedule; stationary machine agents; time buffer stage; Computer simulation; Computerized monitoring; Condition monitoring; Control systems; Mobile agents; Processor scheduling; Production facilities; Production systems; Real time systems; XML;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Semiconductor Manufacturing, 2005. ISSM 2005, IEEE International Symposium on
  • Conference_Location
    San Jose, CA
  • Print_ISBN
    0-7803-9143-8
  • Type

    conf

  • DOI
    10.1109/ISSM.2005.1513371
  • Filename
    1513371