    Upgrade of a paper mill power distribution system

  • Author

    Kirek, Laurie S. ; Woodman, Mark J.

  • Author_Institution
    Westvaco Corp., North Charleston, SC, USA
  • fYear
    1994
  • fDate
    20-24 Jun 1994
  • Firstpage
    152
  • Lastpage
    162
  • Abstract
    A utility capacity increase from 50 to 100 MVA was implemented in a large Kraft paper mill. All existing plant 15 kV switchgear and controls were replaced and a new tie line constructed during a nine month period prior to the utility increase. Electrical and process control rooms were built to house new switchgear and computer control equipment. All installation work was done during outages scheduled for other plant objectives. New switchgear installed consists of 42 cells of 1000 MVA class equipment. The control system includes operator workstations, supervisory PLC, and remote I/O racks. Breaker control, metering, and load shedding functions are performed by the control system
  • Keywords
    distribution networks; engineering workstations; industrial computer control; installation; load shedding; paper industry; power system computer control; programmable controllers; project engineering; switchgear; 100 MVA; 1000 MVA; 15 kV; USA; capacity increase; circuit breaker; distribution system; load shedding; metering; operator workstations; outages; paper mill; remote I/O racks; supervisory PLC; switchgear; tie line; upgrade project; Boilers; Control systems; Inductors; Milling machines; Paper making machines; Paper mills; Power distribution; Power generation; Standby generators; Switchgear;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Pulp and Paper Industry Technical Conference, 1994., Conference Record of 1994 Annual
  • Conference_Location
    Nashville, TN
  • Print_ISBN
    0-7803-2028-X
  • Type

    conf

  • DOI
    10.1109/PAPCON.1994.324494
  • Filename
    324494