• DocumentCode
    2094923
  • Title

    Quality robustness design of manufacturing systems with repair and rework

  • Author

    Li, Jingshan ; Blumenfeld, Dennis E. ; Marin, Samuel P.

  • Author_Institution
    Manuf. Syst. Res. Lab, Gen. Motors Res. & Dev. Center, Warren, MI
  • fYear
    2006
  • fDate
    15-19 May 2006
  • Firstpage
    1060
  • Lastpage
    1065
  • Abstract
    In this paper, we study a manufacturing system with repair and rework. We show that in such systems the product quality, in terms of quality buy rate (the good job ratio of all jobs), can be described by a function of repair capacity and first time quality (the good job ratio of all first time processed jobs). Variations in first time quality can lead to reduction of quality buy rate and substantial waste of production capacity and materials. Therefore, the repair and rework system should be designed to be robust to the fluctuations. Moreover, we observe that the quality buy rate is practically independent of the distribution of the first time quality, but depends primarily on its coefficient of variations
  • Keywords
    maintenance engineering; manufacturing systems; product design; production management; quality control; manufacturing systems; product quality; quality buy rate; quality robustness design; repair capacity; Automotive engineering; Fluctuations; Lead time reduction; Manufacturing systems; Postal services; Product design; Production systems; Robustness; Throughput; Waste materials;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Robotics and Automation, 2006. ICRA 2006. Proceedings 2006 IEEE International Conference on
  • Conference_Location
    Orlando, FL
  • ISSN
    1050-4729
  • Print_ISBN
    0-7803-9505-0
  • Type

    conf

  • DOI
    10.1109/ROBOT.2006.1641850
  • Filename
    1641850