DocumentCode :
2098854
Title :
Resource shadow price calculation under long-term and short-term production
Author :
Zheng, Shanshui
Author_Institution :
Logistics Education Dept, Guangzhou Institute of Railway Technology, China
fYear :
2010
fDate :
4-6 Dec. 2010
Firstpage :
3099
Lastpage :
3102
Abstract :
Shadow price has important guiding significance for resource allocation. However, the definition of shadow price is usually associated with short-term production. while the adjustments of multiple resource elements in the long-term production have always been ignored. In this article, the author consider the total revenue function as a piecewise linear function of resource combination, and use the directional derivative to calculate the shadow price in view of short-term production and long-term production respectively. This method is not only suitable for the calculation of shadow price under a single resource element adjustment, but also multiple resource elements adjustments.
Keywords :
Linear programming; Operations research; Production; Programming profession; Resource management; Time measurement; Linear Programming; Resource Allocation; Resource Constant; Shadow Price;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Information Science and Engineering (ICISE), 2010 2nd International Conference on
Conference_Location :
Hangzhou, China
Print_ISBN :
978-1-4244-7616-9
Type :
conf
DOI :
10.1109/ICISE.2010.5689233
Filename :
5689233
Link To Document :
بازگشت