DocumentCode
2099474
Title
Analyze on Development Prospects of 300m Level Ultra-high CFRD from Shuibuya High CFRD
Author
Wang Li-bin ; Yan Qiao
Author_Institution
Coll. of Civil & Hydropower Eng., China Three Gorges Univ., Yichang, China
fYear
2010
fDate
28-31 March 2010
Firstpage
1
Lastpage
4
Abstract
Successful experiences of Shuibuya CFRD are comprehensively expounded. The feasibility and the necessity constructing 300 m level ultra-high CFRD are analyzed. According to successful experiences gained, existing key technical problems are analyzed in 300 m level ultra-high CFRD construction and the future development prospects are explored.
Keywords
concrete; dams; Shuibuya high CFRD; concrete faced rockfill dam; ultra-high CFRD; Building materials; Compaction; Composite materials; Concrete; Educational institutions; Filling; Hydroelectric power generation; Joining materials; Rivers; Testing;
fLanguage
English
Publisher
ieee
Conference_Titel
Power and Energy Engineering Conference (APPEEC), 2010 Asia-Pacific
Conference_Location
Chengdu
Print_ISBN
978-1-4244-4812-8
Electronic_ISBN
978-1-4244-4813-5
Type
conf
DOI
10.1109/APPEEC.2010.5448667
Filename
5448667
Link To Document