DocumentCode
2099578
Title
Stochastic single machine scheduling with earliness and tardiness penalties and proportional weights
Author
Jia, Chunfu
Author_Institution
Coll. of Inf. Technol. & Sci., Nankai Univ., Tianjin, China
Volume
6
fYear
2002
fDate
2002
Firstpage
4455
Abstract
The problem of minimizing total weighted deviations of job completion times from a common due date on a single machine is a typical scheduling model in a just-in-time production environment. It is a NP-hard problem. However, the largest processing time job sequence is optimal for the case where job weights are proportional to processing times. In this paper, we consider the stochastic counterpart of this problem with proportional weights. The processing times and the due date are exponentially distributed random variables with arbitrary positive rates. It is shown that the largest expected processing time job sequence is optimal. Moreover, the version where the machine is subject to stochastic breakdowns is also discussed.
Keywords
computational complexity; optimisation; production control; random processes; NP-hard problem; job completion times; job sequence; just-in-time; largest processing time; production control; proportional weight; random due date; random processing times; stochastic single machine scheduling; Educational institutions; Electric breakdown; Electronic mail; Information technology; Optimal scheduling; Random variables; Single machine scheduling; Stochastic processes;
fLanguage
English
Publisher
ieee
Conference_Titel
American Control Conference, 2002. Proceedings of the 2002
ISSN
0743-1619
Print_ISBN
0-7803-7298-0
Type
conf
DOI
10.1109/ACC.2002.1025351
Filename
1025351
Link To Document