• DocumentCode
    2101482
  • Title

    Flexibility Integrated System Model and Building of Construction Supply Chain

  • Author

    Zhai Yun-kai

  • Author_Institution
    Manage. Eng. Sch., Zhengzhou Univ., Zhengzhou, China
  • fYear
    2009
  • fDate
    20-22 Sept. 2009
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    With the instability of competitive environment and the uncertainty of project owner´s demand, improving flexibility of construction supply chain (CSC) will promote the competence of enterprise, supply chain and industry. The paper proposes the conceptual model and flexible system integrated model of CSC. And the paper considers that the enhancement of CSC flexibility should integrate three levels: point-line-plane (enterprise-supply chain-industry).
  • Keywords
    construction industry; supply and demand; supply chain management; competitive environment; construction industry; construction supply chain; flexibility integrated system model; project owner demand; Buildings; Construction industry; Delay; Hardware; Raw materials; Software systems; Supply chain management; Supply chains; Technological innovation; Uncertainty;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Management and Service Science, 2009. MASS '09. International Conference on
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-4638-4
  • Electronic_ISBN
    978-1-4244-4639-1
  • Type

    conf

  • DOI
    10.1109/ICMSS.2009.5302101
  • Filename
    5302101