• DocumentCode
    2105381
  • Title

    Optimal Allocation of Maintenance Budgets for Reliability Target Setting

  • Author

    Teera-achariyakul, N. ; Chulakhum, K. ; Rerkpreedapong, D. ; Raphisak, P.

  • Author_Institution
    Dept. of Electr. Eng., Kasetsart Univ., Bangkok, Thailand
  • fYear
    2010
  • fDate
    28-31 March 2010
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    This paper proposes a pragmatic method of preventive maintenance budget allocation and reliability target setting for electric power distribution utilities. In this research, supplementary maintenance activities are selected by the RCM analysis to improve the reliability of 12 regions of the Provincial Electricity Authority (PEA) of Thailand. Next, the optimization problem is formulated in order to optimally allocate maintenance budgets to all regions with the aim of minimizing the total customer-minute of interruptions (CMI) of the PEA. Later, the targets of SAIFI and SAIDI of all regions can be set using the optimally allocated budgets resulted from the proposed method.
  • Keywords
    optimisation; power distribution reliability; preventive maintenance; RCM analysis; Thailand; electric power distribution; optimization problem; preventive maintenance budget allocation; provincial electricity authority; reliability target setting; total customer-minute of interruptions; Costs; Data analysis; Personnel; Power distribution; Power engineering and energy; Power system reliability; Preventive maintenance; Radio spectrum management; Reliability engineering; Spline;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power and Energy Engineering Conference (APPEEC), 2010 Asia-Pacific
  • Conference_Location
    Chengdu
  • Print_ISBN
    978-1-4244-4812-8
  • Electronic_ISBN
    978-1-4244-4813-5
  • Type

    conf

  • DOI
    10.1109/APPEEC.2010.5448913
  • Filename
    5448913