DocumentCode :
2111474
Title :
Longitudinal matching between the LEB and the MEB for the SSC
Author :
Mahale, N.K. ; Maschke, A.
Author_Institution :
Superconducting Supercollider Lab., Dallas, TX, USA
fYear :
1991
fDate :
6-9 May 1991
Firstpage :
389
Abstract :
Longitudinal matching of bunches between the Low Energy Booster (LEB) and the Medium Energy Booster (MEB), if done by controlling the RF voltage alone, requires too low a voltage to be practicable. An investigation is made of the possibility of dynamic matching by bunch rotation in the longitudinal phase space at the end of the LEB cycle. First, bunches are sheared by an RF phase-jump into the unstable region and then the bunch is matched by jumping back to the synchronous phase. Sensitivity to errors in phase and timing are studied.<>
Keywords :
particle beam diagnostics; proton accelerators; synchrotrons; Low Energy Booster; Medium Energy Booster; RF voltage; bunch rotation; dynamic matching; longitudinal phase space; Contracts; Educational institutions; Low voltage; Protection; Space charge; Timing; US Government; Voltage control;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 1991. Accelerator Science and Technology., Conference Record of the 1991 IEEE
Conference_Location :
San Francisco, CA, USA
Print_ISBN :
0-7803-0135-8
Type :
conf
DOI :
10.1109/PAC.1991.164311
Filename :
164311
Link To Document :
بازگشت