Title :
Risk assessment and management decision-making of project duration
Author :
Lijiao, Xu ; Jianfeng, Li ; Fei, Zhang
Author_Institution :
College of Architectural Engineering, Chang´´an University, Xi´´an, China
Abstract :
As the theoretical basis of risk assessment and management decision-making, AHP and utility theory were introduced during the project construction. Combining with example, index system of risk factors was established, and AHP was used to do the risk assessment in order to identify a greater impact on the duration of several risk factors. Then utility theory was proposed to do the management decisions effectively by analyzing the utility value of each risk factor.
Keywords :
Decision making; Electronics industry; Indexes; Presses; Risk management; Road transportation; Utility theory; AHP; management decision-making; project duration; risk assessment; utility theory;
Conference_Titel :
Information Science and Engineering (ICISE), 2010 2nd International Conference on
Conference_Location :
Hangzhou, China
Print_ISBN :
978-1-4244-7616-9
DOI :
10.1109/ICISE.2010.5689817