• DocumentCode
    2112602
  • Title

    Risk assessment and management decision-making of project duration

  • Author

    Lijiao, Xu ; Jianfeng, Li ; Fei, Zhang

  • Author_Institution
    College of Architectural Engineering, Chang´´an University, Xi´´an, China
  • fYear
    2010
  • fDate
    4-6 Dec. 2010
  • Firstpage
    6115
  • Lastpage
    6118
  • Abstract
    As the theoretical basis of risk assessment and management decision-making, AHP and utility theory were introduced during the project construction. Combining with example, index system of risk factors was established, and AHP was used to do the risk assessment in order to identify a greater impact on the duration of several risk factors. Then utility theory was proposed to do the management decisions effectively by analyzing the utility value of each risk factor.
  • Keywords
    Decision making; Electronics industry; Indexes; Presses; Risk management; Road transportation; Utility theory; AHP; management decision-making; project duration; risk assessment; utility theory;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Information Science and Engineering (ICISE), 2010 2nd International Conference on
  • Conference_Location
    Hangzhou, China
  • Print_ISBN
    978-1-4244-7616-9
  • Type

    conf

  • DOI
    10.1109/ICISE.2010.5689817
  • Filename
    5689817