DocumentCode
2112602
Title
Risk assessment and management decision-making of project duration
Author
Lijiao, Xu ; Jianfeng, Li ; Fei, Zhang
Author_Institution
College of Architectural Engineering, Chang´´an University, Xi´´an, China
fYear
2010
fDate
4-6 Dec. 2010
Firstpage
6115
Lastpage
6118
Abstract
As the theoretical basis of risk assessment and management decision-making, AHP and utility theory were introduced during the project construction. Combining with example, index system of risk factors was established, and AHP was used to do the risk assessment in order to identify a greater impact on the duration of several risk factors. Then utility theory was proposed to do the management decisions effectively by analyzing the utility value of each risk factor.
Keywords
Decision making; Electronics industry; Indexes; Presses; Risk management; Road transportation; Utility theory; AHP; management decision-making; project duration; risk assessment; utility theory;
fLanguage
English
Publisher
ieee
Conference_Titel
Information Science and Engineering (ICISE), 2010 2nd International Conference on
Conference_Location
Hangzhou, China
Print_ISBN
978-1-4244-7616-9
Type
conf
DOI
10.1109/ICISE.2010.5689817
Filename
5689817
Link To Document