Assessment of Spillage of Large-scale Hydropower Plant Undertaking Spinning Reserve
Author
Xu Chen-guang ; Zhao Mai-huan ; Zhang Xiang-Da
Author_Institution
North China Inst. of Water Conservancy & Hydroelectric Power, Zhengzhou, China
fYear
2010
fDate
28-31 March 2010
Firstpage
1
Lastpage
4
Abstract
Since the large-scale hydropower plant must undertake the spinning reserve of power system, a small amount of out-flow water does not generate electricity. In order to increase water use efficiency, it is necessary to calculate the spillage owing to improper dispatch. Therefore, the optimal operation of hydroelectric systems should be obligated with the undertaking spinning reserve. A calculation method of the spillage owing to improper dispatch for large-scale is discussed. And this method is used to calculate the spillage owing to improper dispatch of Longyangxia hydropower plant in 2001. The spillage owing to improper dispatch is remarkable, which could be saved by proper dispatch.
Keywords
hydroelectric power stations; large-scale systems; optimisation; power generation dispatch; Longyangxia hydropower plant; hydroelectric systems; improper dispatch; large-scale hydropower plant; optimal operation; out-flow water; power system; spillage assessment; spinning reserve; water use efficiency; Hydroelectric power generation; Large-scale systems; Power generation; Power system dynamics; Power system planning; Power system security; Power system stability; Power systems; Spinning; Water conservation;
fLanguage
English
Publisher
ieee
Conference_Titel
Power and Energy Engineering Conference (APPEEC), 2010 Asia-Pacific
Conference_Location
Chengdu
Print_ISBN
978-1-4244-4812-8
Electronic_ISBN
978-1-4244-4813-5
Type
conf
DOI
10.1109/APPEEC.2010.5449313
Filename
5449313
Link To Document