    Assessment of Spillage of Large-scale Hydropower Plant Undertaking Spinning Reserve

  • Author

    Xu Chen-guang ; Zhao Mai-huan ; Zhang Xiang-Da

  • Author_Institution
    North China Inst. of Water Conservancy & Hydroelectric Power, Zhengzhou, China
  • fYear
    2010
  • fDate
    28-31 March 2010
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    Since the large-scale hydropower plant must undertake the spinning reserve of power system, a small amount of out-flow water does not generate electricity. In order to increase water use efficiency, it is necessary to calculate the spillage owing to improper dispatch. Therefore, the optimal operation of hydroelectric systems should be obligated with the undertaking spinning reserve. A calculation method of the spillage owing to improper dispatch for large-scale is discussed. And this method is used to calculate the spillage owing to improper dispatch of Longyangxia hydropower plant in 2001. The spillage owing to improper dispatch is remarkable, which could be saved by proper dispatch.
  • Keywords
    hydroelectric power stations; large-scale systems; optimisation; power generation dispatch; Longyangxia hydropower plant; hydroelectric systems; improper dispatch; large-scale hydropower plant; optimal operation; out-flow water; power system; spillage assessment; spinning reserve; water use efficiency; Hydroelectric power generation; Large-scale systems; Power generation; Power system dynamics; Power system planning; Power system security; Power system stability; Power systems; Spinning; Water conservation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power and Energy Engineering Conference (APPEEC), 2010 Asia-Pacific
  • Conference_Location
    Chengdu
  • Print_ISBN
    978-1-4244-4812-8
  • Electronic_ISBN
    978-1-4244-4813-5
  • Type

    conf

  • DOI
    10.1109/APPEEC.2010.5449313
  • Filename
    5449313