• DocumentCode
    2115901
  • Title

    Optimization of the spare-part procure plan based on production plan in a steel pipe enterprise

  • Author

    Liu, Bo ; Dong, Shaohua ; Cheng, Xiangming

  • Author_Institution
    Sch. of Mech. Eng., Univ. of Sci. & Technol. Beijing, Beijing, China
  • fYear
    2012
  • fDate
    21-23 April 2012
  • Firstpage
    2735
  • Lastpage
    2738
  • Abstract
    In this paper, with the onsite research of the procure plan process in a steel pipe enterprise, a optimizing model is set for due date setting of purchase plan and reducing the cost, also a solution using Genetic Algorithms is offered.
  • Keywords
    cost reduction; genetic algorithms; maintenance engineering; pipes; procurement; production planning; purchasing; steel industry; cost reduction; due date setting; genetic algorithms; optimization; production planning; purchase planning; spare part procurement planning; steel pipe enterprise; Companies; Genetic algorithms; Genetics; Optimization; Procurement; Production; Steel; Genetic algorithm; Purchasing plan; Spare parts;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Consumer Electronics, Communications and Networks (CECNet), 2012 2nd International Conference on
  • Conference_Location
    Yichang
  • Print_ISBN
    978-1-4577-1414-6
  • Type

    conf

  • DOI
    10.1109/CECNet.2012.6201590
  • Filename
    6201590