DocumentCode
2119442
Title
Production scheduling validity in high level supply chain models
Author
Parsons, David J. ; Phelps, Richard A.
Author_Institution
Simulation Dynamics, Maryville, TN, USA
Volume
1
fYear
2001
fDate
2001
Firstpage
560
Abstract
Although they focus on the big picture, high level supply chain models cannot gloss over the capacity of production nodes to meet production allocations. Capacity is not simply a reflection of equipment production rates. Short runs drive down utilization by increasing total time lost to changeovers. Multistage plants require coordination of capacities at the several production stages. In short, production capacity is crucially affected by the way production runs are scheduled through plants. Modeling actual scheduling practice is often unrealistic, since methods vary from plant to plant, and involve a blend between planned schedules and on-the-fly adjustments. This paper suggests that there is a range of approaches to modeling production scheduling. In the modeling of supply chains, modeling alternatives must be assessed in terms of cost of development and implementation versus validity
Keywords
digital simulation; production control; retail data processing; high level supply chain models; multistage plants; on-the-fly adjustments; production allocations; production runs; production scheduling; production scheduling validity; Chemical industry; Chemical processes; Costs; Gold; Job shop scheduling; Material storage; Production; Raw materials; Reflection; Supply chains;
fLanguage
English
Publisher
ieee
Conference_Titel
Simulation Conference, 2001. Proceedings of the Winter
Conference_Location
Arlington, VA
Print_ISBN
0-7803-7307-3
Type
conf
DOI
10.1109/WSC.2001.977339
Filename
977339
Link To Document