Project delay risk analysis in aviation manufacturing enterprise
Author
Wu Yi ; Qiu Wanhua ; Zhou Peng ; Lin Jian
Author_Institution
Dept of Economic & Manage., Beijing Univ. of Aeronaut. & Astronaut., Beijing, China
fYear
2010
fDate
29-31 July 2010
Firstpage
1763
Lastpage
1767
Abstract
To deal with the risk of project delay in aviation manufacturing enterprises and with the attempt to give project managers a more accurate understanding of project time scheduling, a novel concept of probability tolerance design is discussed in this article. Probability tolerance design focuses on optimizing the estimation of the task duration tolerance with the consideration of stochastic situations. The key part of the approach, fuzzy real option analysis of the investment decision and Stochastic Critical Path Method is discussed fully in the article and a methodology of simulation is considered to deal with the problem occurred in the calculations.
Keywords
aerospace industry; critical path analysis; delays; design engineering; investment; optimisation; probability; project management; risk analysis; scheduling; stochastic processes; tolerance analysis; aviation manufacturing enterprise; fuzzy real option analysis; investment decision; optimization; probability tolerance design; project delay risk analysis; project time scheduling; stochastic critical path method; stochastic situations; task duration tolerance estimation; Delay; Estimation; Investments; Job shop scheduling; Manufacturing; Schedules; Aviation Manufacturing Enterprises; Probability Tolerance Design; Project Scheduling Management;
fLanguage
English
Publisher
ieee
Conference_Titel
Control Conference (CCC), 2010 29th Chinese
Conference_Location
Beijing
Print_ISBN
978-1-4244-6263-6
Type
conf
Filename
5573960
Link To Document