• DocumentCode
    2121904
  • Title

    Scheduling batch processing machines in complex job shops

  • Author

    Oey, Kasin ; Mason, Scott J.

  • Author_Institution
    Dept. of Ind. Eng., Arkansas Univ., Fayetteville, AR, USA
  • Volume
    2
  • fYear
    2001
  • fDate
    2001
  • Firstpage
    1200
  • Abstract
    This paper considers a complex job shop problem with reentrant flow and batch processing machines. A modified shifting bottleneck heuristic (MSB) is considered for generating machine schedules to minimize the total weighted tardiness. We observe that the MSB could produce infeasible schedules where cyclic schedules are found. A cycle elimination procedure is proposed to remove the possibility of the MSB generating cyclic schedules in the solution
  • Keywords
    batch processing (industrial); flow graphs; integrated circuit manufacture; production control; complex job shop problem; cycle elimination procedure; cyclic schedules; disjunctive graph; machine schedules; modified shifting bottleneck heuristic; reentrant flow; scheduling batch processing machines; semiconductor manufacturing; total weighted tardiness minimization; Boron; Conductors; Customer satisfaction; Industrial engineering; Job shop scheduling; Manufacturing industries; Marketing and sales; Semiconductor device manufacture; Semiconductor device reliability; Silicon;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Simulation Conference, 2001. Proceedings of the Winter
  • Conference_Location
    Arlington, VA
  • Print_ISBN
    0-7803-7307-3
  • Type

    conf

  • DOI
    10.1109/WSC.2001.977434
  • Filename
    977434