• DocumentCode
    2122119
  • Title

    Life cycle water usage in CdTe photovoltaics

  • Author

    Sinha, Parikhit ; Meader, Amy ; de Wild-Scholten, Mariska

  • Author_Institution
    First Solar, Tempe, AZ 85281 USA
  • fYear
    2012
  • fDate
    3-8 June 2012
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    Life cycle water withdrawal for cadmium telluride photovoltaics (CdTe PV) ranges from approximately 382–425 L/MWh, with only ∼12% from direct on-site usage. The remainder is related to indirect waterwithdrawal from the use of grid electricity and raw materials throughout the product life cycle. Approximately half of life cycle water withdrawal is associated with module manufacturing, one-third from balance of systems (BOS), and the remainder from takeback and recycling. Primary contributors to life cycle water withdrawal are the use of grid electricity, glass, and on-site water during manufacturing; steel, copper, inverters, and on-site water in the BOS; and electricity, chemical use, and transport during takeback and recycling. During manufacturing, water consumption is approximately one quarter of withdrawal and is due to cooling tower water evaporation and site irrigation. When deployed in the U.S. Southwest, a CdTe PV array can provide net displacement of life cycle water withdrawal of over 1700–5600 L/MWh relative to grid electricity.
  • Keywords
    Arrays; Electricity; Manufacturing; Photovoltaic systems; Recycling; Water conservation; Water resources; Environmental management; thin-film photovoltaic (PV) modules and manufacturing; water resources;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Photovoltaic Specialists Conference (PVSC), Volume 2, 2012 IEEE 38th
  • Conference_Location
    Austin, TX, USA
  • Type

    conf

  • DOI
    10.1109/PVSC-Vol2.2012.6656781
  • Filename
    6656781