    Simulation of bored pile construction

  • Author

    Zayed, Tarek M. ; Halpin, Daniel W.

  • Author_Institution
    Constr. Eng. & Manage. Dept., Zagazig Univ., Egypt
  • Volume
    2
  • fYear
    2001
  • fDate
    2001
  • Firstpage
    1495
  • Abstract
    The installation of pile foundations is complicated by an enormous number of problems. They include unseen subsurface obstacles, lack of contractor experience, and site planning. These major problems and other minor ones make it difficult for the estimator to evaluate the piling project productivity and cost. Therefore, this study is designed to assess these problems using simulation. Both piling process productivity and cycle time assessment are addressed. Data were collected for this study through designed questionnaires, site interviews, and telephone calls to experts in different construction companies. Many variables have been considered in the piling construction process. Two simulation models have been designed and validated to assess piling process productivity and cycle time. Consequently, two sets of charts have been developed based upon the validated models to provide the decision-maker with a solid planning, scheduling and control tool for piling projects
  • Keywords
    civil engineering computing; digital simulation; bored pile foundations; construction companies; contractor experience; cycle time assessment; piling project productivity; site interviews; site planning; unseen subsurface obstacles; Concrete; Costs; Drilling; Engineering management; Production; Productivity; Soil; Solid modeling; Steel; Telephony;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Simulation Conference, 2001. Proceedings of the Winter
  • Conference_Location
    Arlington, VA
  • Print_ISBN
    0-7803-7307-3
  • Type

    conf

  • DOI
    10.1109/WSC.2001.977477
  • Filename
    977477