DocumentCode
2123118
Title
Practical approaches for validating a construction simulation
Author
Shi, Jonathan Jingsheng
Author_Institution
Dept. of Civil & Archit. Eng., Illinois Inst. of Technol., Chicago, IL, USA
Volume
2
fYear
2001
fDate
2001
Firstpage
1534
Abstract
This paper presents three methods implemented in the activity-based construction modeling and simulation (ABC) system for validating a construction simulation. The first method reports a simulation experiment in chronological order so that the user can examine the operating sequence of the model. The second method provides the summary information of total operating counts and mean durations of all activities in the model so that the user can evaluate whether all activities have been correctly executed during simulation. The third method produces the cyclic report of a selected resource entity so that the user can examine whether the entity is moving in the correct logical and chronological order during simulation. The three methods can effectively assist the user in debugging a simulation model so as to assure that the simulation is correctly conducted. A road paving process is employed to illustrate these methods
Keywords
building; civil engineering computing; digital simulation; formal verification; program debugging; activity-based construction modeling and simulation system; chronological order; construction simulation validation; cyclic report; debugging; mean durations; operating sequence; resource entity; road paving process; total operating counts; Application software; Computational modeling; Computer aided manufacturing; Computer simulation; Cyclones; Debugging; Electronic switching systems; Manufacturing industries; Mathematical model; Roads;
fLanguage
English
Publisher
ieee
Conference_Titel
Simulation Conference, 2001. Proceedings of the Winter
Conference_Location
Arlington, VA
Print_ISBN
0-7803-7307-3
Type
conf
DOI
10.1109/WSC.2001.977482
Filename
977482
Link To Document