CBR Approach in BOT Project Risk Assessment
Author
Liu, Ning ; Dai, Dashuang ; Wu, Haixi
Author_Institution
Sch. of Manage., Dalian Univ. of Technol., Dalian, China
fYear
2009
fDate
20-22 Sept. 2009
Firstpage
1
Lastpage
4
Abstract
This paper uses case-based reasoning (CBR) approach to establish estimation method of build-operate-transfer (BOT) project risk, through a CBR assessment system that helps stakeholder to master the specific features of the BOT project under the present conditions. Affected by numerous factors related both to the specific features of the project and dynamically changed situations, BOT projects risk assessment problems are highly unstructured. Risk management aims to anticipate the future performances of the project and the economic parameter range of the project. Through the CBR system, similar cases can be retrieved to assess the possible influence of BOT project risk degree. An example of garbage burning power plant in china is explained and evaluated to demonstrate the feasibility of the method.
Keywords
case-based reasoning; risk management; BOT project risk assessment; CBR approach; build-operate-transfer project risk; case-based reasoning; estimation method; garbage burning power plant; risk management; Decision making; Environmental economics; Paper technology; Power generation; Power generation economics; Project management; Risk analysis; Risk management; Technology management; Utility theory;
fLanguage
English
Publisher
ieee
Conference_Titel
Management and Service Science, 2009. MASS '09. International Conference on
Conference_Location
Wuhan
Print_ISBN
978-1-4244-4638-4
Electronic_ISBN
978-1-4244-4639-1
Type
conf
DOI
10.1109/ICMSS.2009.5302985
Filename
5302985
Link To Document