Title :
Switchable 10 Hz/1 Hz LEB magnet power supply system
Author_Institution :
Superconducting Super Collider Lab., Dallas, TX, USA
Abstract :
The author describes the present design of the ring magnet power supply system of the low-energy booster (LEB), a rapid cycling synchrotron to be built at the Superconducting Super Collider Laboratory in the injector complex. The LEB is a separated function design with dipole and quadrupole magnets driven by a single power supply system. Tracking errors between dipoles and quadrupoles are corrected by separate quadrupole magnets powered from independent power supplies. The dipoles and quadrupoles are excited with a 10 Hz biased sine wave or 1 Hz linear ramp. Change of operating mode from 10 Hz to 1 Hz takes no more than 2 h. The magnets, the 1 Hz and 10 Hz modes of operation, and the harmonic and power factor correction are discussed.<>
Keywords :
electromagnets; power supplies to apparatus; switched mode power supplies; 1 Hz; 1 Hz linear ramp; 10 Hz; 10 Hz biased sine wave; 2 h; SSC; design; dipoles; low-energy booster; quadrupoles; rapid cycling synchrotron; ring magnet power supply system; tracking errors; Inductance; Inductors; Laboratories; Magnetic resonance; Magnetic separation; Magnetic switching; Power supplies; RLC circuits; Superconducting magnets; Voltage;
Conference_Titel :
Particle Accelerator Conference, 1991. Accelerator Science and Technology., Conference Record of the 1991 IEEE
Conference_Location :
San Francisco, CA, USA
Print_ISBN :
0-7803-0135-8
DOI :
10.1109/PAC.1991.164451