Title :
Modelling of a combined cycle conversion using Simulink
Author :
Scott, P.H. ; Russell, J.P.
Author_Institution :
Parsons Turbine Generators Ltd., UK
Abstract :
Tenaga Nasional Generating Authority of Malaysia has decided to upgrade the existing steam turbo-generating plant to a more efficient combined cycle plant. Parsons Turbine Generators Ltd. (PTGL) were to supply one steam turbine and the necessary control equipment for a combined cycle system. The control of combined cycle plant was known to be a difficult task, involving the efficient sharing of load between the gas and the steam turbines, the limiting of ramping rates, and the control of boiler steam pressures. Simulink package was used to model the associated plant and to aid the design of a control strategy for the combined cycle plant.
Keywords :
CAD; combined cycle power stations; control engineering computing; digital simulation; gas turbines; power engineering computing; steam turbines; CAD; Malaysia; Parsons Turbine Generators; Simulink; Tenaga Nasional Generating Authority; boiler steam pressures; combined cycle plant; control equipment; digital simulation; gas turbine; load sharing; ramping rates; steam turbine;
Conference_Titel :
Control, 1994. Control '94. International Conference on
Conference_Location :
Coventry, UK
Print_ISBN :
0-85296-610-5
DOI :
10.1049/cp:19940160