• DocumentCode
    2129711
  • Title

    Spatial analysis based on GIS in the application of construction of urban underground rail

  • Author

    Jia, Jian-hua ; Wang, Cui

  • Author_Institution
    College of Geomatics, Xi´an University of Science and Technology, China
  • fYear
    2010
  • fDate
    4-6 Dec. 2010
  • Firstpage
    4030
  • Lastpage
    4032
  • Abstract
    The monitoring of construction for metro is an important procedure of guaranteeing construction safety and engineering quality, but the current monitoring data processing, analysis and transfer methods are unable to meet the need of safety management. Based on requirement investigation in metro companies, This paper puts forward a method with application of GIS software ArcGIS9.3. The functions of which such as map editing, data management, spatial analysis and three dimensional simulation carried on the analysis and processing can bc carried out to the subsidence data monitor for subway construction. It has been indicated in practice that new method provides the visual technical support and decision-making references vividly for the project managers and workers.
  • Keywords
    Decision making; Geographic Information Systems; Geography; Monitoring; Software; Steady-state; Three dimensional displays; ArcScene; Subsidence monitoring; Three dimensional statistical analysis; Three dimensional visual analysis; subway construction;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Information Science and Engineering (ICISE), 2010 2nd International Conference on
  • Conference_Location
    Hangzhou, China
  • Print_ISBN
    978-1-4244-7616-9
  • Type

    conf

  • DOI
    10.1109/ICISE.2010.5690475
  • Filename
    5690475