Author :
Borchardt, I. ; Brauer, D. ; Chermenin, S. ; Degèle, D. ; Escherich, K. ; Fiebig, H.J. ; Grabe, H. ; Holz, J. ; Hubert, D. ; Kus, R. ; Leenen, M. ; Maywald, H. ; Peters, O. ; Petersen, B. ; Pieczora, K. ; Riemer, U. ; Sanok, Z. ; Schmüser, P. ; Schollmeie
Abstract :
The arcs of the proton storage ring of HERA are equipped with superconducting magnets. The magnets are arranged in a regular FODO cell structure consisting of two quadrupoles and four dipoles. The cryostats of the dipoles and the quadrupoles have a length of 9.7 m and 4 m, respectively. There are 422 dipoles and 224 quadrupoles in the ring, including some special magnets. In addition, there are about 1500 superconducting correction elements. The sequence of installation is discussed. The manpower requirements and the installation speed are described. Project engineering and project management aspects are considered.<>
Keywords :
beam handling equipment; electron accelerators; proton accelerators; storage rings; superconducting magnets; FODO cell structure; HERA tunnel; cryostats; dipoles; installation speed; project engineering; project management; proton storage ring; quadrupoles; superconducting correction elements; superconducting magnets; Cryogenics; Helium; Magnetic field measurement; Protons; Quality control; Storage rings; Superconducting cables; Superconducting magnets; Testing; Vehicles;
Conference_Titel :
Particle Accelerator Conference, 1991. Accelerator Science and Technology., Conference Record of the 1991 IEEE