DocumentCode
2132117
Title
Construction of a new Tevatron collider beam abort dump
Author
Hanna, B. ; Crawford, C.
Author_Institution
Fermi Nat. Accel. Lab., Batavia, IL, USA
fYear
1991
fDate
6-9 May 1991
Firstpage
970
Abstract
As part of the collider upgrade, a new abort system is to be installed in the Tevatron at A0. It consists of two sets of fast kickers and two 90% full aperture graphite beam dumps. The system has 10 steel cored kickers, 5 at each end of the straight section, 2 internal beam absorbers, and 2 sets of beam position monitors, one set in front of each absorber. The kickers are each 88.06-in long while each absorber is 188-in long. Before a collider run can begin, all devices in A0 used for fixed target extraction must be removed. The abort system will be mounted on moveable plates and rolled in after the extraction devices are moved out. This system will abort both protons and antiprotons. Details of the beam dump design and construction are presented.<>
Keywords
particle accelerator accessories; proton accelerators; synchrotrons; Tevatron collider beam abort dump; beam position monitors; fast kickers; full aperture graphite beam dumps; steel cored kickers; Colliding beam devices; Magnetic materials; Magnets; Particle beams; Protons; Steel; Structural beams; Superconducting coils; Superconducting materials; Temperature;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 1991. Accelerator Science and Technology., Conference Record of the 1991 IEEE
Conference_Location
San Francisco, CA, USA
Print_ISBN
0-7803-0135-8
Type
conf
DOI
10.1109/PAC.1991.164507
Filename
164507
Link To Document