An effective method for large scale project planning with multiple fuzzy activity times
Author
Tsujimura, Yasuhiro ; Chang, In Seong ; Gen, Mitsuo
Author_Institution
Dept. of Ind. & Syst. Eng., Ashikaga Inst. of Technol., Japan
fYear
1993
fDate
1993
Firstpage
1009
Abstract
Presents a method for solving a project planning problem in which the opinions of experts greatly disagree in terms of each activity processing time. Here, the goal is to determine the fuzzy project completion time and the degree of criticality for each path in a project network. Triangular fuzzy numbers (TFNs) are used to represent activity times of experts. Pessimistic object plan is introduced with major TFNs and an optimistic project plan with minor TFNs. The approach is illustrated by using a combination of the existing composite and comparison methods to determine the fuzzy project completion time and the degree of criticality for each path
Keywords
expert systems; fuzzy logic; project management; criticality; expert systems; fuzzy project completion time; large scale project planning; major TFNs; minor TFNs; multiple fuzzy activity times; pessimistic object plan; triangular fuzzy numbers; Fuzzy systems; Large-scale systems; Optimization methods; Path planning; Process planning; Project management; Random variables; Systems engineering and theory; Technology planning; Uncertainty;
fLanguage
English
Publisher
ieee
Conference_Titel
Fuzzy Systems, 1993., Second IEEE International Conference on
Conference_Location
San Francisco, CA
Print_ISBN
0-7803-0614-7
Type
conf
DOI
10.1109/FUZZY.1993.327376
Filename
327376
Link To Document