  • Title

    An effective method for large scale project planning with multiple fuzzy activity times

  • Author

    Tsujimura, Yasuhiro ; Chang, In Seong ; Gen, Mitsuo

  • Author_Institution
    Dept. of Ind. & Syst. Eng., Ashikaga Inst. of Technol., Japan
  • fYear
    1993
  • fDate
    1993
  • Firstpage
    1009
  • Abstract
    Presents a method for solving a project planning problem in which the opinions of experts greatly disagree in terms of each activity processing time. Here, the goal is to determine the fuzzy project completion time and the degree of criticality for each path in a project network. Triangular fuzzy numbers (TFNs) are used to represent activity times of experts. Pessimistic object plan is introduced with major TFNs and an optimistic project plan with minor TFNs. The approach is illustrated by using a combination of the existing composite and comparison methods to determine the fuzzy project completion time and the degree of criticality for each path
  • Keywords
    expert systems; fuzzy logic; project management; criticality; expert systems; fuzzy project completion time; large scale project planning; major TFNs; minor TFNs; multiple fuzzy activity times; pessimistic object plan; triangular fuzzy numbers; Fuzzy systems; Large-scale systems; Optimization methods; Path planning; Process planning; Project management; Random variables; Systems engineering and theory; Technology planning; Uncertainty;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Fuzzy Systems, 1993., Second IEEE International Conference on
  • Conference_Location
    San Francisco, CA
  • Print_ISBN
    0-7803-0614-7
  • Type

    conf

  • DOI
    10.1109/FUZZY.1993.327376
  • Filename
    327376