Simulation Evaluating Feasibility of Highway Construction Schedules Considering Random Factors
Author
Liu Weijun
Author_Institution
Sch. of Traffic & Transp. Eng., Changsha Univ. of Sci. & Technol., Changsha, China
fYear
2009
fDate
20-22 Sept. 2009
Firstpage
1
Lastpage
4
Abstract
In highway engineering, lots of random factors including raining, quantity and status of machines available for projects have direct impact on activities time. Therefore, while scheduling a project, managers always increase spare machines or prolong the activity time to avoid delaying the project time when those random factors have bad influence in construction site. However, how many are the spare machines and how long are the prolonged activities time, which are estimated subjectively by managers. This subjective estimation has been criticized for systematically overestimating or underestimating quantity of the machines and the activity time. In the paper, we analyze main random factors influencing the highway construction, and propose the algorithms to simulate if it is raining and the status of the machines in construction site. By analyzing the simulation trials results, there are lots of useful information for the project managers to evaluate the feasibility of the construction schedule.
Keywords
civil engineering computing; roads; scheduling; highway construction schedule simulation; highway engineering; project scheduling; random factors; Algorithm design and analysis; Analytical models; Computational modeling; Computer simulation; Delay effects; Information analysis; Processor scheduling; Project management; Road transportation; Traffic control;
fLanguage
English
Publisher
ieee
Conference_Titel
Management and Service Science, 2009. MASS '09. International Conference on
Conference_Location
Wuhan
Print_ISBN
978-1-4244-4638-4
Electronic_ISBN
978-1-4244-4639-1
Type
conf
DOI
10.1109/ICMSS.2009.5303706
Filename
5303706
Link To Document