• DocumentCode
    2148839
  • Title

    Beam position monitoring in the AGS Linac to Booster transfer line

  • Author

    Shea, T.J. ; Brodowski, J. ; Witkover, R.

  • Author_Institution
    Brookhaven Nat. Lab., Upton, NY, USA
  • fYear
    1991
  • fDate
    6-9 May 1991
  • Firstpage
    1428
  • Abstract
    A beam position monitor system has been developed and used in the commissioning of Brookhaven´s Linac-to-Booster transfer line. This line transports a chopped, RF modulated H/sup -/ beam from the 200-MeV Linac to the AGS Booster. Over a 15-dB dynamic range in beam current, the position monitor system provides a real-time, normalized position signal with an analog bandwidth of about 20 MHz. Seven directional coupler style pickups are installed in the line with each pickup sensing both horizontal and vertical position. A system overview is presented along with results from the commissioning experience.<>
  • Keywords
    ion accelerators; linear accelerators; particle beam diagnostics; proton accelerators; synchrotrons; AGS Linac to Booster transfer line; beam current; commissioning; directional coupler style pickups; normalized position signal; position monitor system; Amplitude modulation; Control systems; Electrodes; Linear particle accelerator; Monitoring; Optical modulation; Phase modulation; Radio frequency; Stripline; Transfer functions;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1991. Accelerator Science and Technology., Conference Record of the 1991 IEEE
  • Conference_Location
    San Francisco, CA, USA
  • Print_ISBN
    0-7803-0135-8
  • Type

    conf

  • DOI
    10.1109/PAC.1991.164657
  • Filename
    164657