• DocumentCode
    2149492
  • Title

    Contract WBS applicants in the deputy construction project cost regulation

  • Author

    Yunna, Wu ; Yue, Shen ; Xinliang, Hu ; Yubo, Liu

  • Author_Institution
    Dept.of business administration, North China Electric, Power University, Beijing, China
  • fYear
    2010
  • fDate
    4-6 Dec. 2010
  • Firstpage
    2711
  • Lastpage
    2714
  • Abstract
    Based on Contract WBS the summaries in the research achievements related to the supervision of the construction projects, the thesis emphatically analyses contents and key points in supervision of the agent construction management from the construction agent and the government perspective, all of which aims at the current situation and the solution to the implementation problems. This thesis constructs cost vertical control system and set up the crosswise coordination supervisory mechanism. Finally, this thesis integrated these two systems, and designed funds coordination supervision system of the agent construction project, then elaborated this system´s movement pattern in detail. The system is carrying on the supervision to the funds from inside to outside, which guaranteed security effective use of the funds in the agent construction project.
  • Keywords
    Contracts; Control systems; Government; Investments; Planning; Project management; agent projects; contract WBS; funds coordination supervision; supervision system;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Information Science and Engineering (ICISE), 2010 2nd International Conference on
  • Conference_Location
    Hangzhou, China
  • Print_ISBN
    978-1-4244-7616-9
  • Type

    conf

  • DOI
    10.1109/ICISE.2010.5691311
  • Filename
    5691311