• DocumentCode
    2151979
  • Title

    Vibration Control Management to Secure Safety and Fast Drilling

  • Author

    Liu, Wei ; Zhou, Yingcao

  • Author_Institution
    Drilling Res. Inst., China Nat. Pet. Co., Beijing, China
  • fYear
    2009
  • fDate
    20-22 Sept. 2009
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    In order to achieve the highest rate of return of investment, drilling project must increase rate of penetration under safety drilling. Drilling project management is one of key factors to secure drilling safely and fast. But the factors which affect the present management are not analyzed effectively in system, especially for vibration phenomenon of drilling operation, so couldn´t manage exactly. Only after systematic analysis various factors, such as the structure of drill bit and drilling string system (bottom hole assembly, bit type), operational parameters drilling art (weight on bit, rotation of bit), geometry of drilled trajectory and formation character, the method and procedure of vibration control management can be established to decrease harm of vibration, achieve highest rate of penetration, shorten drilling period and increase rate of return of investment.
  • Keywords
    investment; oil drilling; project management; safety; vibration control; drilling project management; drilling string system; return of investment; safety drilling; vibration control management; Art; Assembly systems; Drilling; Frequency; Geometry; Investments; Petroleum; Project management; Safety; Vibration control;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Management and Service Science, 2009. MASS '09. International Conference on
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-4638-4
  • Electronic_ISBN
    978-1-4244-4639-1
  • Type

    conf

  • DOI
    10.1109/ICMSS.2009.5303971
  • Filename
    5303971