Study on the risk management of BOT project based on BP neural network
Author
Chen, Lixin ; Li, Yunhua
Author_Institution
School of Business Administration, Liaoning Technical University, Huludao, China
fYear
2010
fDate
4-6 Dec. 2010
Firstpage
3175
Lastpage
3178
Abstract
In this paper, according to the characteristics of BOT project risk, we combined the vertical tree of work breakdown with the horizontal tree of decomposing risk to form the WBS-RBS risk identification matrix. Based on the existing risk identification, we created the BP neural network model, and carried out the risk assessment through the learning and training of BP neural network, which has ensured the scientificalness and accuracy of risk assessment. Finally, we put forward some coping strategies against the risk of BOT project.
Keywords
Artificial neural networks; Companies; Electric breakdown; Government; Matrix decomposition; Risk management; Training; BOT; BP neural network; WBS-RBS matrix; risk assessment; risk identification;
fLanguage
English
Publisher
ieee
Conference_Titel
Information Science and Engineering (ICISE), 2010 2nd International Conference on
Conference_Location
Hangzhou, China
Print_ISBN
978-1-4244-7616-9
Type
conf
DOI
10.1109/ICISE.2010.5691566
Filename
5691566
Link To Document