Title :
Study on the risk management of BOT project based on BP neural network
Author :
Chen, Lixin ; Li, Yunhua
Author_Institution :
School of Business Administration, Liaoning Technical University, Huludao, China
fYear :
2010
fDate :
4-6 Dec. 2010
Firstpage :
3175
Lastpage :
3178
Abstract :
In this paper, according to the characteristics of BOT project risk, we combined the vertical tree of work breakdown with the horizontal tree of decomposing risk to form the WBS-RBS risk identification matrix. Based on the existing risk identification, we created the BP neural network model, and carried out the risk assessment through the learning and training of BP neural network, which has ensured the scientificalness and accuracy of risk assessment. Finally, we put forward some coping strategies against the risk of BOT project.
Keywords :
Artificial neural networks; Companies; Electric breakdown; Government; Matrix decomposition; Risk management; Training; BOT; BP neural network; WBS-RBS matrix; risk assessment; risk identification;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Information Science and Engineering (ICISE), 2010 2nd International Conference on
Conference_Location :
Hangzhou, China
Print_ISBN :
978-1-4244-7616-9
Type :
conf
DOI :
10.1109/ICISE.2010.5691566
Filename :
5691566
Link To Document :
بازگشت