Title :
Automatic reactive compensation at 11 kV
Author :
Kwok, Stephen C C ; Pang, Arthur S F
Author_Institution :
China Light & Power Co. Ltd., Hong Kong
Abstract :
In order to fulfil reactive power requirements, capacitors need to be switched in during the load pickup period in the morning and switched out during the load dropping period in the evening. This creates a heavy workload on the control engineers, distracting their attention in monitoring the power system and delaying their responses to site operations. In order to reduce the workload of the control engineers, China Light and Power Co. Ltd. studied several methods of automating these switching operations. Finally, it was decided to develop a software application to automate the switching of these capacitors. This paper describes this automatic capacitors switching application
Keywords :
switching; 11 kV; China Light and Power Company; architectural design; automatic reactive compensation; capacitor switching; data repository system; load dropping period; load pickup period; reactive power requirements; software application; substations; switching operations automation;
Conference_Titel :
Advances in Power System Control, Operation and Management, 1997. APSCOM-97. Fourth International Conference on (Conf. Publ. No. 450)
Print_ISBN :
0-85296-912-0
DOI :
10.1049/cp:19971916