DocumentCode :
2160014
Title :
Research on capacity planning problem in MTO enterprises group
Author :
Bo, Hong-guang ; Zhang, Shu-ran ; Liu, Xiao-bing
Author_Institution :
Department of Enterprise Management, School of Management, Dalian University of Technology, 116024, China
fYear :
2010
fDate :
4-6 Dec. 2010
Firstpage :
473
Lastpage :
477
Abstract :
A capacity planning problem is described in MTO operation environment for the enterprises group. The orders are accepted by the group and then are allocated to the enterprises for the maximum net revenue. Capacity planning problem is discussed. Order processing and allocating problems are discussed in the enterprises group. An capacity planning model is proposed. Batch production is considered. Then a mathematic model is presented to solve the problem. An application case is presented to testify the model with the algorithm of Genetic Algorithm.
Keywords :
Biological system modeling; Capacity planning; Materials; Mathematical model; Resource management; Steel; Make-To-Order; batch production; capacity planning; enterprises group;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Information Science and Engineering (ICISE), 2010 2nd International Conference on
Conference_Location :
Hangzhou, China
Print_ISBN :
978-1-4244-7616-9
Type :
conf
DOI :
10.1109/ICISE.2010.5691708
Filename :
5691708
Link To Document :
بازگشت