DocumentCode :
2162200
Title :
Decision-making to antisepsis project for ship with LCC technique
Author :
Geng, JunBao ; Zhang, XiaoHai ; Zhang, Jun
Author_Institution :
Coll. of ships & powers, Navy Univ. of Eng., Wuhan, China
Volume :
4
fYear :
2010
fDate :
26-28 Feb. 2010
Firstpage :
274
Lastpage :
277
Abstract :
Dissimilar ship paint has the different ability for antisepsis and defending dirty, the paint also has dissimilar influence to the ship economy. From the point of the life cycle cost (LCC), the antisepsis expenses models were established. The models include LCC calculation model, paint quantity calculation model and the area of paint calculation model etc. Taking some specified ship as a research object, the four projects of painting were established. The LCC of the four paint projects were calculated through using the LCC technique. Comprehensive comparison is made form the principle of the paint, effect of defending dirty, comprehensive performance etc., and the best paint project is confirmed.
Keywords :
decision making; life cycle costing; painting; shipbuilding industry; LCC calculation model; antisepsis project; decision making; dissimilar ship paint; life cycle cost technique; paint quantity calculation model; Cathodes; Corrosion; Costs; Decision making; Investments; Marine vehicles; Painting; Paints; Protection; Radiofrequency interference; Corrosion; Life Cycle Cost; Paint; Ship economy;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Computer and Automation Engineering (ICCAE), 2010 The 2nd International Conference on
Conference_Location :
Singapore
Print_ISBN :
978-1-4244-5585-0
Electronic_ISBN :
978-1-4244-5586-7
Type :
conf
DOI :
10.1109/ICCAE.2010.5451701
Filename :
5451701
Link To Document :
بازگشت