DocumentCode :
2164998
Title :
Applying fuzzy sets and linear programming for measuring total duration in a project network with fuzzy activity duration
Author :
Hong, xiang-Ouyang ; Xinjuan-zhang
Author_Institution :
Business School of Hohai University, Nanjing, Jiangsu, China
fYear :
2010
fDate :
4-6 Dec. 2010
Firstpage :
144
Lastpage :
147
Abstract :
In the traditional CPM/PERT model, the durations of activities are either represented as crisp numbers or drawn from the beta distribution to estimate the task durations. However, the operation time for each activity is usually difficult to define and estimate precisely in a real situation. The aim of this paper is to present an analytical method for measuring the total duration of a project network with fuzzy activity times. The method is mainly based on the linear programming (LP) formulation and Zadeh´s extension principle. In the last, an example illustrates that the proposed approach is able to find the membership function of the total duration time.
Keywords :
Fuzzy sets; Linear programming; Operations research; Planning; Project management; Shape; Stochastic processes; Fuzzy CPM; Fuzzy sets; linear programming;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Information Science and Engineering (ICISE), 2010 2nd International Conference on
Conference_Location :
Hangzhou, China
Print_ISBN :
978-1-4244-7616-9
Type :
conf
DOI :
10.1109/ICISE.2010.5691903
Filename :
5691903