Title :
Test Policy: Gaining Control on IT Quality and Processes
Author :
Pinkster-O´Riordain, I.
Author_Institution :
Logica Nederland B. V., Amstelveen
Abstract :
Too often projects deliver software of which the quality is difficult to predict. Sometimes the project completion is delayed due to the continuous change of requirements while the software is still being built. The quality level must align with the company needs. It is extremely important that the planned benefits of an IT system are reached. When the benefits are not achieved it will cause much more damage than just the cost of delay. The reputation of a company might be at stake!
Keywords :
program testing; software development management; software quality; IT quality; project completion; software delivery; test policy; Aerospace safety; Companies; Costs; Delay; Guidelines; Iris; Logic testing; Process design; Software quality; Software testing;
Conference_Titel :
Software Testing Verification and Validation Workshop, 2008. ICSTW '08. IEEE International Conference on
Conference_Location :
Lillehammer
Print_ISBN :
978-0-7695-3388-9
DOI :
10.1109/ICSTW.2008.42