DocumentCode
2165554
Title
Test Policy: Gaining Control on IT Quality and Processes
Author
Pinkster-O´Riordain, I.
Author_Institution
Logica Nederland B. V., Amstelveen
fYear
2008
fDate
9-11 April 2008
Firstpage
338
Lastpage
342
Abstract
Too often projects deliver software of which the quality is difficult to predict. Sometimes the project completion is delayed due to the continuous change of requirements while the software is still being built. The quality level must align with the company needs. It is extremely important that the planned benefits of an IT system are reached. When the benefits are not achieved it will cause much more damage than just the cost of delay. The reputation of a company might be at stake!
Keywords
program testing; software development management; software quality; IT quality; project completion; software delivery; test policy; Aerospace safety; Companies; Costs; Delay; Guidelines; Iris; Logic testing; Process design; Software quality; Software testing;
fLanguage
English
Publisher
ieee
Conference_Titel
Software Testing Verification and Validation Workshop, 2008. ICSTW '08. IEEE International Conference on
Conference_Location
Lillehammer
Print_ISBN
978-0-7695-3388-9
Type
conf
DOI
10.1109/ICSTW.2008.42
Filename
4567030
Link To Document