Title :
The project duration risk analysis based on earned value measurement
Author :
Yu, Xiaozhong ; Hu, Hong
Author_Institution :
School of Economics and Management, Southwest Petroleum University, Chengdu, China
Abstract :
The project duration risk analysis has become more and more important with project management raised the duration requirement. Most of the existing analysis methods lack the linkage analysis of cost risk, aimed at this disadvantage, this paper proposes a new analysis method to project duration risk based on earned value measurement, discusses the different possible risk types under different earned value indexes, then divides the severity of duration risk into five different levels which will be convenient for project managers to take measures. Furthermore, an example is given behind in detail expressly illustrated the analysis process.
Keywords :
Couplings; Indexes; Loss measurement; Project management; Risk analysis; Schedules; Time measurement; Duration risk; Earned Value Measurement; Risk analysis;
Conference_Titel :
Information Science and Engineering (ICISE), 2010 2nd International Conference on
Conference_Location :
Hangzhou, China
Print_ISBN :
978-1-4244-7616-9
DOI :
10.1109/ICISE.2010.5691975