DocumentCode
2167182
Title
A decision tool for assembly line breakdown action
Author
Shin, Frank ; Ram, Bala ; Gupta, Aman ; Yu, Xuefeng ; Menassa, Roland
Author_Institution
Dept. of Ind. & Syst. Eng., North Carolina A&T State Univ., Greensboro, NC, USA
Volume
2
fYear
2004
fDate
5-8 Dec. 2004
Firstpage
1122
Abstract
Assembly lines with closed loop parallel lanes have the potential to continue to be productive when individual stations breakdown. A requirement in such parallel lane systems is that the products must exit the parallel lanes in the same sequence as they entered. Such lines offer the opportunity to run the line partially either by shutting down an affected lane or by bypassing the failed station to continue to run on all lanes. Bypassing a station, however, requires a backup station that can pick up the incomplete work at a later stage in the process. However, when a station breakdown occurs, it is not readily obvious as to whether to bypass the affected lane or just the affected station. This decision will vary depending on which station failed and the length of the repair. This paper presents a discrete-event modeling approach to provide a decision-making tool during breakdowns.
Keywords
assembling; closed loop systems; decision making; discrete event simulation; job shop scheduling; assembly line breakdown action; closed loop parallel lanes; decision tool; decision-making tool; discrete-event modeling approach; individual station breakdown; Assembly; Decision making; Electric breakdown; Geometry; Investments; Manufacturing automation; Materials handling; Pulp manufacturing; Virtual manufacturing; Workstations;
fLanguage
English
Publisher
ieee
Conference_Titel
Simulation Conference, 2004. Proceedings of the 2004 Winter
Print_ISBN
0-7803-8786-4
Type
conf
DOI
10.1109/WSC.2004.1371438
Filename
1371438
Link To Document