DocumentCode :
2169826
Title :
Notice of Retraction
The Research and Application on the Control of Construction Project Delay Based on Value-Based Network
Author :
Sumian Peng ; Meng Chen
Author_Institution :
Sch. of Econ. & Manage., Beijing Jiao Tong Univ., Beijing, China
fYear :
2010
fDate :
24-26 Aug. 2010
Firstpage :
1
Lastpage :
5
Abstract :
Notice of Retraction

After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.

We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.

The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.

In this paper, we analysis from the reasons for the delay duration, the impact of delays, the use of the progress of analytical methods, the progress of dynamic control theory methods to research the construction delays in control of summing up the status quo at home and abroad, in the study of existing examples of foundation engineering construction , combined with our construction projects, network development trend of the value network theory, used in construction project management control process, for the theory of value-based network construction project schedule control, a range of issues analysis and research.
Keywords :
civil engineering; project management; scheduling; construction project delay; delay duration; dynamic control theory methods; foundation engineering construction; value network theory; value-based network; Construction industry; Contracts; Delay; Organizations; Project management; Virtual enterprises;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Management and Service Science (MASS), 2010 International Conference on
Conference_Location :
Wuhan
Print_ISBN :
978-1-4244-5325-2
Type :
conf
DOI :
10.1109/ICMSS.2010.5577048
Filename :
5577048
Link To Document :
بازگشت