DocumentCode
2173105
Title
Industrial materials and processes
Author
Etinger, D.
Author_Institution
Professional Inventory & Procurement Assoc., 26 Glenvale Blvd., Brampton, Ont., Canada
fYear
1993
fDate
14-17 Sep 1993
Firstpage
950
Abstract
In this age of change, the effort of understanding the requirements of our counterparts, peers, etc. becomes more intense each day as our environment, work habits and ethics rely on many more external forces than they have in the past. The stress levels of all concerned disciplines, can be directly measured against the cultural change in the work force and place, as well as the push for greater and faster technologies and information. The history, present and future of process software solutions are outlined, including the increasingly popular MRP II and BRP business process planning paradigms
Keywords
Cultural differences; Ethics; Force measurement; History; Job shop scheduling; Manufacturing; Materials requirements planning; Project management; Stress measurement; Text processing;
fLanguage
English
Publisher
ieee
Conference_Titel
Electrical and Computer Engineering, 1993. Canadian Conference on
Conference_Location
Vancouver, BC
Print_ISBN
0-7803-2416-1
Type
conf
DOI
10.1109/CCECE.1993.332451
Filename
332451
Link To Document