• DocumentCode
    2173705
  • Title

    Research on Duration-Cost-Quality Model under Uncertainty in Construction Project Management

  • Author

    Huang, Jian-Wen ; Chen, Rui ; Wang, Xing-Xai ; Zhou, Yi-Hong

  • Author_Institution
    Coll. of Hydraulic & Environ. Eng., China Three Gorges Univ., Yichang, China
  • fYear
    2010
  • fDate
    24-26 Aug. 2010
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    Schedule, cost and quality control are main aspects in construction project management. Taking duration, cost and quality into account simultaneously, and keeping the balance among them during the whole process of project management are significant for the improvement of the overall benefits of construction project. In general, there is a trade-off between duration, cost and quality to complete a project. On basis of analyzing the relationship of duration, cost and quality, this paper establishes duration-cost model and duration-quality model which considering of uncertainty in construction project management. And a case study is given to verify the feasibility and practicability of the model. It provides scientific basis for project decision-making.
  • Keywords
    costing; project management; quality control; scheduling; construction project management; cost aspect; duration-cost model; duration-cost-quality model; duration-quality model; project decision-making; project management process; quality control aspect; schedule aspect; Analytical models; Biological system modeling; Construction industry; Project management; Schedules; Uncertainty;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Management and Service Science (MASS), 2010 International Conference on
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-5325-2
  • Electronic_ISBN
    978-1-4244-5326-9
  • Type

    conf

  • DOI
    10.1109/ICMSS.2010.5577194
  • Filename
    5577194