Title :
Project Risk Analysis Based on VB Procedures
Author :
Jia, Hu ; Guo, Jiangfeng
Author_Institution :
Dept. of IE, Tianjin Univ., Tianjin, China
fYear :
2009
fDate :
20-22 Sept. 2009
Firstpage :
1
Lastpage :
4
Abstract :
In this paper, the study is how to make use of VB program for the project risk analysis. Program design is based on the idea of the principles of Monte Carlo. The key is the set-up of random variables and steps for realization.
Keywords :
Monte Carlo methods; Visual BASIC; production engineering computing; project management; risk management; Monte Carlo simulation; VB procedure; VB program; program design; project risk analysis; random variable; Analytical models; Decision making; Electronic mail; Mathematical model; Monte Carlo methods; Project management; Random variables; Risk analysis; Risk management; Stochastic processes;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Management and Service Science, 2009. MASS '09. International Conference on
Conference_Location :
Wuhan
Print_ISBN :
978-1-4244-4638-4
Electronic_ISBN :
978-1-4244-4639-1
Type :
conf
DOI :
10.1109/ICMSS.2009.5304989
Filename :
5304989
Link To Document :
بازگشت