DocumentCode
2184000
Title
Coping with typical unpredictable incidents in a logic fab
Author
Scholl, Wolfgang
Author_Institution
Infineon Technol. Dresden, Dresden, Germany
fYear
2008
fDate
7-10 Dec. 2008
Firstpage
2030
Lastpage
2034
Abstract
Within the last months the semiconductor plant of Infineon in Dresden has converted to a pure manufacturer of logic products. With it, premises for production control have changed to short and, first of all, predictable cycle times. Typical for a logic fab, intelligent performance monitoring and prediction methods have to be installed, coping scheduled and unscheduled disturbances. Most important method is transient fab simulation, giving a 3-months performance forecast based on actual line situation and planned changes in toolset and product mix. This continuous forecast has to be enriched with information to scheduled and unscheduled fab disturbances for just in time initiation of countermeasures in case of foreseeable excursions, e.g. changes in dispatching. In particular, breakdowns have to be analyzed from historical data to find typical patterns, for probability of occurrence and, especially, machine group specific behavior. This paper presents the procedure on the basis of three examples.
Keywords
capacity planning (manufacturing); logic circuits; production control; scheduling; semiconductor device manufacture; Dresden; Infineon; intelligent performance monitoring; logic fab; machine group specific behavior; prediction methods; production control; semiconductor plant; unpredictable incidents; Data analysis; Dispatching; Electric breakdown; Job shop scheduling; Logic; Monitoring; Prediction methods; Predictive models; Production control; Semiconductor device manufacture;
fLanguage
English
Publisher
ieee
Conference_Titel
Simulation Conference, 2008. WSC 2008. Winter
Conference_Location
Austin, TX
Print_ISBN
978-1-4244-2707-9
Electronic_ISBN
978-1-4244-2708-6
Type
conf
DOI
10.1109/WSC.2008.4736298
Filename
4736298
Link To Document