DocumentCode
2184087
Title
Bee Colony Optimization algorithm with Big Valley landscape exploitation for Job Shop Scheduling problems
Author
Wong, Li-Pei ; Puan, Chi Yung ; Low, Malcolm Yoke Hean ; Chong, Chin Soon
Author_Institution
Sch. of Comput. Eng., Nanyang Technol. Univ., Singapore, Singapore
fYear
2008
fDate
7-10 Dec. 2008
Firstpage
2050
Lastpage
2058
Abstract
Scheduling is a crucial activity in semiconductor manufacturing industry. Effective scheduling in its operations leads to improvement in the efficiency and utilization of its equipment. Job shop scheduling is an NP-hard problem which is closely related to some of the scheduling activities in this industry. This paper presents an improved bee colony optimization algorithm with big valley landscape exploitation as a biologically inspired approach to solve the job shop scheduling problem. Experimental results comparing our proposed algorithm with shifting bottleneck heuristic, tabu search algorithm and bee colony algorithm with neighborhood search on Taillard JSSP benchmark show that it is comparable to these approaches.
Keywords
job shop scheduling; optimisation; search problems; semiconductor device manufacture; JSSP benchmark; NP-hard problem; bee colony algorithm with neighborhood search; big valley landscape exploitation; job shop scheduling problems; semiconductor manufacturing industry; shifting bottleneck heuristic; tabu search algorithm; Benchmark testing; Computer aided manufacturing; Heuristic algorithms; Job shop scheduling; Manufacturing industries; Processor scheduling; Routing; Scheduling algorithm; Semiconductor device manufacture; Space exploration;
fLanguage
English
Publisher
ieee
Conference_Titel
Simulation Conference, 2008. WSC 2008. Winter
Conference_Location
Austin, TX
Print_ISBN
978-1-4244-2707-9
Electronic_ISBN
978-1-4244-2708-6
Type
conf
DOI
10.1109/WSC.2008.4736301
Filename
4736301
Link To Document