DocumentCode :
2184883
Title :
Simulation based planning and scheduling system for TFT-LCD Fab
Author :
Park, Bum C. ; Park, Eui S. ; Choi, Byoung K. ; Kim, Byung H. ; Lee, Jin H.
Author_Institution :
Samsung Electron. Co. Ltd., Asan, South Korea
fYear :
2008
fDate :
7-10 Dec. 2008
Firstpage :
2271
Lastpage :
2276
Abstract :
In a typical LCD factory, a large number of product types are produced concurrently, 24 hours a day and 365 days a year, and there exist various constraints and re-entrant flows in the manufacturing processes. As a result, efficient planning and scheduling of LCD production is a big challenge. Presented in this paper is a simulation-based DPS (daily planning & scheduling) system that was developed by the authors and is being used in a modern LCD Fab in Korea. Also presented in the paper are a business architecture of LCD production management, internal structure of the DPS system, and Fab scheduling logic. The DPS system was installed at a large-size LCD Fab in 2006, and the system has been successfully used for two years leading to a considerable increase in on-time production of LCD panels and a sharp decrease in turn-around time.
Keywords :
liquid crystal displays; optoelectronic devices; production engineering computing; production planning; scheduling; Korea; LCD factory; LCD production management; LCD production planning; LCD production scheduling; TFT-LCD fab; manufacturing processes; planning system; scheduling system; Consumer electronics; Glass; Job shop scheduling; Liquid crystal displays; Logic; Manufacturing processes; Production facilities; Production management; Production planning; Thin film transistors;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Simulation Conference, 2008. WSC 2008. Winter
Conference_Location :
Austin, TX
Print_ISBN :
978-1-4244-2707-9
Electronic_ISBN :
978-1-4244-2708-6
Type :
conf
DOI :
10.1109/WSC.2008.4736330
Filename :
4736330
Link To Document :
بازگشت