DocumentCode
2186795
Title
A design for a beam halo scraper system for the Tevatron Collider
Author
Pruss, S.M.
Author_Institution
Fermi Nat. Accel. Lab., Batavia, IL, USA
fYear
1991
fDate
6-9 May 1991
Firstpage
2340
Abstract
The next Tevatron Collider run will have higher luminosity than the previous run as well as separated beams. In order to achieve a low beam halo background rate in both collider detectors, the beam scraper system has been greatly expanded. In the previous run, only the beam scraper was used, and it was only used at the beginning of stores. For the next run, eight scrapers will be available. Because of the separated orbits, protons and antiprotons must be scraped independently. There are scrapers for both vertical and horizontal planes. For every primary scraper, there is a secondary scraper to catch particles scattered back out of the edge of the primary scraper.<>
Keywords
beam handling equipment; beam handling techniques; proton accelerators; synchrotrons; antiprotons; beam halo background rate; beam halo scraper system; collider detectors; luminosity; primary scraper; protons; secondary scraper; separated beams; separated orbits; Apertures; Colliding beam devices; Laboratories; Lattices; Orbits; Particle accelerators; Particle beams; Particle scattering; Protons; Tail;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 1991. Accelerator Science and Technology., Conference Record of the 1991 IEEE
Conference_Location
San Francisco, CA, USA
Print_ISBN
0-7803-0135-8
Type
conf
DOI
10.1109/PAC.1991.164959
Filename
164959
Link To Document