Study of EPC Project Risk Management Based on Interrelated Tree Method
Author :
Qi, Baoku ; Guo, Liangliang ; Bai, Shu
Author_Institution :
Sch. of Manage., Shenyang Jianzhu Univ., Shenyang, China
fYear :
2010
fDate :
24-26 Aug. 2010
Firstpage :
1
Lastpage :
3
Abstract :
This paper expounds the basic content of Interrelated Tree Method, and builds the Interrelated Tree model of EPC project risk management; On this basis, the paper makes a risk list with the combining methods of qualitative and quantitative analysis and through the prediction and identification of the risk in the EPC project´s whole process, and sets up risk assessment index system of all stages of the EPC project; By using Interrelated Tree Method, this paper analyzes and evaluates the risk in the EPC project´s whole process; and this paper explores effective methods and approaches for EPC project risk management.
Keywords :
construction; procurement; project management; risk management; trees (mathematics); engineering-procurement-construction project risk management; interrelated tree method; qualitative analysis; quantitative analysis; risk assessment index system; risk identification; risk prediction; Correlation; Exchange rates; Indexes; Materials; Quality management; Risk management; Security;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Management and Service Science (MASS), 2010 International Conference on
Conference_Location :
Wuhan
Print_ISBN :
978-1-4244-5325-2
Electronic_ISBN :
978-1-4244-5326-9
Type :
conf
DOI :
10.1109/ICMSS.2010.5577776
Filename :
5577776
Link To Document :
بازگشت